Building type
School

Floor surface
20.000m²

Yearly energy consumption
Gas: 1.300.000 kWh
Electricity: 230.000 kWh

Expected savings
10-15%

Better heating and lower energy cost

The school consists of a kindergarten and a primary and secondary school, all gathered at 1 site in Berchem. The buildings include classrooms, a chapel, gyms and administrative offices.
Factor4 performs a number of energy-saving measures in this school and guarantees the result:

  • Optimalisation of the boiler room regulation
  • Installation of remote controlled heating systems regulators
  • Renovation of lighting

The school makes use of the subsidies by the Flemish government for the measures related to adjusting the heating. More information at www.mijnschoolhelphetklimaat.be (Dutch only)

The energy consumption of the school is monitored using energieID.

 

Project supported by

Services in this project:

 

Performance contracting

We help public authorities and building managers set up EPC and ESCO projects.

Read more

Design and optimisation

We design and develop energy-related components: from conceptual design over detailed drawings to procurement documents. We take on new designs and optimize existing installations. Read more

Measuring performance

We measure building performance using different tools, from sensors over audits to comfort surveys. Read more

Kantoor in België
Lange Winkelhaakstraat 26
B-2060 Antwerpen
T +32 3 225 23 12
Vind hier hoe je ons kan bereiken en waar je kan parkeren.

Kantoor in Nederland
Cronenburg 152
1081 GN Amsterdam
T +31 20 50 41 570

info@factor4.eu

BTW 0884 068 589
IBAN: BE34 7795 9242 3490
BIC: GKCCBEBB
RPR: Mechelen

Contact us

6 + 14 =